
品-改尺寸.png)
A New Class of Building Surface
Uncompromised Aesthetic Freedom
Achieve the authentic look of stone, wood, or brick on any facade, seamlessly blending renewable energy generation with architectural design.
Breakthrough Versatility Beyond Glass
Go beyond the limitations of traditional glass BIPV. Our solution is designed for the 90% of buildings without glass curtain walls, unlocking solar potential for virtually any structure.
Generate over 60% more power than standard 60% transmittance
Generate over 60% more power than standard 60% transmittance glass BIPV while reducing the product’s carbon footprint by 54.6%—maximizing energy yield and sustainability.
Intelligent, Multi-Functional Building Skin
Transform your building envelope into an active system. Customize with integrated displays, enhanced insulation, or air-purifying negative ion release for smarter, healthier, and more adaptive spaces.
International Invention Awards
- Winner of the 123rd Paris International Invention Gold Award
- Winner of the 76th Nuremberg International Exhibition of Inventions Award、
- Winner of the 50th Geneva International Inventions Award
明獎-4.jpg)
More
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
Custom dimensions available
Customizable Color options
eSolarFacade(eBIPV)
Technical Parameters
Energy Efficiency Comparison:
Power Efficiency:60% HIGHER than glass BIPV with 60% transmittance(CQC/TUV certification)
Carbon Emissions:54.6% lower than glass BIPV(BV certification)
eBIPV Technical Specifications
Test Conditions :STC(Standard Test Conditions 1000 W/m2-AM 1.5 -Temperature 25°C)
Maximum Power (Pmax) :59.23~ 166.62 W
Maximum Power Voltage (Vpmax) :20.70 ~29.22 V
Maximum Power Current (Ipmax): 2.86 ~ 5.70 A
Open Circuit Voltage(Voc) :24.18 ~35.52V
Short Circuit Current (Isc) :3.15 ~ 6.17A
Module Efficiency :9.12% ~17.63%
Maximum System Voltage (VDC) :1000 V (TUV/CE/CB/CQC/UKCA)
Series Fuse Rating: 25 A
Power & Other Electrical Specification Tolerance: 5%
Module Weight :15.28kg/m2 (variable for different texture)
Dimensions(Lx W x T): 1140x570x30mm,1200x600x30mm,1254x751x30mm,1260x746x30mm
Maximum Surface Load(Wind / Snow) :2400 Pa rear & front
Hail Impact Resistance :?25mm @23.0 m/s
Glass :No
Back support: Aluminum honeycomb composite panel aluminum frame
Cables & Connectors :300mm,1000mm, 1200mm,4mm2
Front layer :Photon eCovering (High durability, UV resistant)
Backsheet :eCovering (High durability, UV resistant)
Bypass diode: diode x2
Junction Box :Ip68 rated,TUV certified
Temperature Coefficient Isc :0.036%/°C
Temperature Coefficient Voc :-0.25%/°C
Temperature Coefficient Pmax :-0.30% /°C
Nominal Module Operating Temperature :42±3°C
Operating Temperature :-40°C~+85°C
Product limited warranty: 25 years
Perfomance Warranty:
fi ≥98% end of 1st year
fi ≥ 90% end of 12th year
fi ≥80% end of 25th year
Application
- Installation
- Maintenance
- Off-grid energy storage system
Use a laser rangefinder and digital level for wall positioning. Secure the custom keel with an impact drill using mechanical anchoring. Align the panel slots with the keel for initial fixation, then fine-tune and reinforce with specialized connectors to ensure precision and efficiency.


1.Cleaning:
·After acceptance, the frequency of cleaning should be determined based on the level of wall contamination, with a minimum of once a year.
·Use hand soap mixed with tap water, and avoid using organic solvents.
2.Curtain wall inspection and maintenance:
·A comprehensive inspection of the curtain wall should be conducted every five years, including the panels, sealing strips, and sealants.
·Tighten any loose bolts, and for corroded connectors, remove rust and repaint or replace them.
·Loose or damaged panels should be repaired or replaced.
·Sealants and sealing strips that have fallen off or are damaged should be repaired or replaced.
·Damaged components or connectors should be replaced or reinforced if the anchoring is loose
·Regularly check the drainage system, and clear any blockages.
· Any loose or damaged hardware should be replaced.
.png)
Civilian eBIPV (eSolarFacade):
For residential eBIPV (eSolarFacade) solar panels, we’ll provide you with an off-grid energy storage system, including batteries, controllers, and inverters, based on your purchase quantity. For pricing on eBIPV (eSolarFacade) and energy storage systems, please contact your local PHOMI distributor.
Commercial eBIPV (eSolarFacade):
The installation of the electrical part should be carried out simultaneously with the curtain wall installation, and should be carried out strictly in accordance with the special electrical design drawings and the design and construction specifications of the electrical profession.






光.png)


景-1.gif)


景-2.gif)
所.gif)
所.gif)
景-3.gif)

園區外墻-.gif)
樓外立面.png)





